BUSINESS DESCRIPTION
This site 1140 acres has never been mined, it is part of the gold basin as reported by United States Geological Society, which projected between .25 grams a ton to 1.5 grams per ton. The depths down to 120 ft have been tested and gold has been found throughout. The gold alone on this site would be greater than $3.6B at a minimum. We have reports that it is much higher that far exceed government estimates. There is also about .16 oz/ton of Palladium and .55 oz/ton of Silver gives an extremely conservative estimated value of this site over $45B. All operational cost are estimates
tons pt oz/ton total ore price gold
pile 1 2,000,000.00 0.10 200,000.00 1,400.00 280,000,000.00
pile 2 1,500,000.00 2.10 3,150,000.00 1,400.00 4,410,000,000.00
in groud 3,500,000.00 3,350,000.00 4,690,000,000.00
ore/day 1500
oz/ton 0.95
oz/day 1425
oz /month 28500
$ per day 1,995,000
$/month 39,900,000.00
$/year 478,800,000
25% op cost 119700000
Ebit 359,100,000
ore/day 1500
oz/ton 0.95
oz/day 1425
oz /month 28500
$ per day 1,995,000
$/month 39,900,000.00
$/year 478,800,000
25% op cost 119700000
Ebit 359,100,000
gold palladium silver
ton/hour 750 ton/hr 750 750
gram/ton 0.74 oz/ton 0.16 0.55
gram/hour 555 oz/hour 120 412.5
hours/day 12 hours/day 12 12
gram/day 6660 oz/day 1440 4950
$/day $352,980 $/day $1,090,080 $113,850
gram/wk 39960 oz/wk 8640 29700
$/wk $2,117,880 $/wk $6,540,480 $683,100
$/month $8,471,520 $/month $26,161,920 $2,732,400
annual $101,658,240 annual $313,943,040 $32,788,800
$448,390,080
14000000
$434,390,080
Expansion Potential
There is an abundance of gold, silver, palladium and some platinum. The water supply is plentiful and power is within 3 miles. The roads leading to the mine are maintained by the county and in great shape.
Market / Competition / Non-Competition Agreements
NONE